Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Inspections & compliance reviews

Lima WWTP

edoc-1914742
[verified]
Fields
agency
Ohio EPA, Division of Surface Water
district
Northwest District Office
program
NPDES
inspection_type
Reconnaissance Inspection
type_code
RI
facility
Lima WWTP
facility_address
1200 Fort Amanda Rd., Lima, Ohio
permit_no
2PE00000
npdes_id
OH0026069
county
Allen
inspection_date
2016-12-07
report_date
2016-12-16
entry_time
10:30 AM
exit_time
11:40 AM
significant_noncompliance
no
units_in_service
summary
On December 7, 2016, Ohio EPA conducted a Reconnaissance Inspection at Lima WWTP to observe the new pump station and outfall structure. The final effluent at the new outfall was clear, colorless, and had no noticeable odor. No corrective action was needed for any evaluated area, and no significant non-compliance was identified.
note
inspectors
  • Peggy B. Christie
  • Thomas Poffenbarger, P.E.
facility_representatives
  • Mr. Eric Markley, Supervisor
  • Mr. Jerry Coffey
observations
    • kind finding
    • text E. NPDES Compliance — Corrective Action Needed: N
    • number
    • deadline
    • kind finding
    • text F. Operations & Maintenance — Corrective Action Needed: N
    • number
    • deadline
    • kind finding
    • text G. Operator Certification — Not Evaluated
    • number
    • deadline
    • kind finding
    • text H. Collection System — Not Evaluated
    • number
    • deadline
    • kind finding
    • text I. Sludge Management — Not Evaluated
    • number
    • deadline
    • kind finding
    • text J. Storm Water — Not Evaluated
    • number
    • deadline
    • kind finding
    • text K. Self-Monitoring Program — Not Evaluated
    • number
    • deadline
    • kind finding
    • text L. Laboratory — Not Evaluated
    • number
    • deadline
    • kind finding
    • text M. Effluent / Receiving Water Observations — Corrective Action Needed: N. Final effluent clear, colorless and had no noticeable odor. New pump station and outfall are operational.
    • number
    • deadline
⚠ Gaps in the record
  • The Significant Non-Compliance box on the form appears blank/unmarked; recorded as false based on no corrective actions needed across all evaluated areas.
  • Page image was read with an embedded OCR layer noted as unreliable; key fields verified against image.
  • Permit Expiration Date (2/28/2015) predates the inspection date (12/7/2016) — this may indicate the permit was under renewal at time of inspection.
oepa/lima/edoc-1914742.inspection.yaml · p.1 · oepa