Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Network · docs

Docs

The investigation's long-form prose, migrated from docs/ into the site (issue #69). It's network-global — the method and analysis behind the record, not per-site data — so it reads the same files as-is, rewriting their cross-links into the new sections.

12 essays · 4 sections

Research dossier — A synthesis of everything deconstructed from the record — the actors, the corridor, the case.

18 min read 12 essays 150 min end to end

12 published essays, 32,913 words — counted from the bodies this build renders. The collection carries no publication dates, so nothing here is ordered by recency.

Reports

Reports
End use & workloads — what the facility is for
The customer is known (Google); the use is not. What the Select-Committee record establishes about hyperscale vs colocation vs federal enclaves — and the open question of who can use the Lima campus.
Read
Reports
The defense nexus — what the corridor shows, and what it can't
A defense plant nearby, a developer cleared to SECRET, an industry that hosts the CIA — three true facts that don't, combined, make a finding. The sharpest open question, held open.
Read
Reports
Toxics and the corridor — the river the campus joins
The campus discharges into a river that is already 93% treated effluent at low flow, in a corridor carrying the county's heaviest industrial toxic load. What RSEI screening shows, what it can't measure, and the assimilative question the record leaves open.
Read
Reports
The load and the grid — a city's worth of demand, and who carries it
A single campus equal to ~5–6% of its utility's entire retail load, for ~50 jobs — load, not jobs. The headline “313 MW” is backup generation (and redacted in the final permit); “behind-the-meter” is a claim, not a fact. What the record carries, and who pays to carry the load.
Read
Reports
The economic ledger — what the deal costs, modeled where the record is silent
A 15-year public ledger of the deal: ~$45M–$90M in forgone tax for ~50 jobs (≈0.1% of a shrinking county). Four figures the record withholds — the building share, the job count, the school terms, the equipment spend — are modeled as a band across scenarios rather than blanked or guessed.
Read

The record

The environment

About