Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Inspections & compliance reviews

Lima WWTP

edoc-1914740
[verified]
Fields
agency
Ohio EPA, Division of Surface Water
district
Northwest District Office
program
NPDES
inspection_type
Reconnaissance Inspection
type_code
RI
facility
Lima WWTP
facility_address
1200 Fort Amanda Rd., Lima, Ohio
permit_no
2PE00000
npdes_id
OH0026069
county
Allen
inspection_date
2016-10-18
report_date
2016-11-03
entry_time
10:10
exit_time
11:35
significant_noncompliance
units_in_service
summary
On October 18, 2016, Ohio EPA conducted a Reconnaissance Inspection at the City of Lima's WWTP to observe the air break constructed to prevent backflow from the sludge thickening tanks to the chlorine contact tank. The air break was found to be installed and no corrective action was needed for Operations & Maintenance or Effluent/Receiving Water Observations. The effluent following dechlorination was clear, colorless, and had no noticeable odor.
note
inspectors
  • Peggy B. Christie
facility_representatives
  • Eric Markley, Supervisor
observations
    • kind finding
    • text Operations & Maintenance — Corrective Action Needed: N. Air break installed to prevent sludge backflow to chlorine contact tank.
    • number F
    • deadline
    • kind finding
    • text Effluent / Receiving Water Observations — Corrective Action Needed: N. Effluent observed following de-chlorination was clear, colorless and had no noticeable odor.
    • number M
    • deadline
    • kind finding
    • text Comments: Construction continues on headworks. Checked the temporary sampling location for 001 and 604 which is necessary due to construction.
    • number
    • deadline
⚠ Gaps in the record
  • The Significant Non-Compliance box on the form appears blank/unpopulated — recorded as null rather than false.
  • The embedded OCR layer is partially corrupted (Section headers garbled); values verified against the page image.
  • Document is read from a page image; OCR text layer is noted as unreliable.
oepa/lima/edoc-1914740.inspection.yaml · p.1 · oepa