Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building

← Start here

Watermark · story

The story, chapter by chapter

6 chapters, ordered cause → consequence. Each advances the story and teaches one record-reading skill, anchored to a real document you can open and check. Follow it straight through, or drop into any chapter and peel off into the library when something catches your eye.

  1. 1 Who is actually building this? Reading a deed · cross-document entity resolution Anchor: The deed chain + the Bistrozzi Delaware shell cluster
  2. 2 How it was assembled & hidden Reading an options-to-assignment chain · the confidentiality-first sequence Anchor: The Port Authority options → Bistrozzi assignment + the blank DTE-100 prices
  3. 3 How big is it — and what won't they tell you? Reading an air permit · recognizing a CBI redaction Anchor: Ohio EPA Air Permit-to-Install P0138965
  4. 4 What it does to the water Reading an NPDES permit · the 7Q10 low-flow screen Anchor: NPDES dilution + the cooling-draw screen
  5. 5 What it costs the public Reading a cost estimate · reading a contract clause Anchor: Tetra Tech OPC + the Roadwork Development Agreement
  6. 6 Why you had to dig for this Reading statutory exemptions Anchor: The withholding stack + the mandamus thread

All 6 chapters are live, end to end — each teaches one record-reading skill through the Record Teardown pattern, in cause → consequence order.