Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →

← Concepts

Concept · term

PUCO

Public Utilities Commission of Ohio

Ohio's utility regulator, overseeing the rates and service of electric, gas, water, and telecom utilities in the state.

[verified]
  • energy
  • grid
  • regulator

The Public Utilities Commission of Ohio regulates the state's investor-owned utilities — setting the rates, terms, and service standards under which a company like AEP Ohio delivers electricity. Its cases run as docketed proceedings with filed testimony and public comment, so a PUCO docket is a durable record of what a utility proposed and what it was allowed.

PUCO is where the cost of accommodating a new large load can surface: a utility's request to build infrastructure, recover a special-contract arrangement, or shift the cost of serving a hyperscale customer onto or away from other ratepayers runs through the commission. It pairs with the Ohio Power Siting Board, which certifies where a major facility is built; the separate federal FERC holds jurisdiction over interstate wholesale power, while the PUCO's own authority is the state's retail service and rates — a division of labor the platform keeps straight when tracing who approved what.

Ask this concept

Search the corpus around PUCO — the records, entities, and open questions in its neighborhood. Results are cited corpus nodes, not a written answer; for a drafted answer over the whole record, use the site-wide Ask.