Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Plans

BOSC Storm Outfall (and the Beery Rd. & Cole St. roundabout)

4091286
[verified]
Fields
project_name
Beery Road and Cole Street Roundabout / BOSC Storm Outfall
facility_name
BOSC Storm Outfall (and the Beery Rd. & Cole St. roundabout)
record_type
Stormwater Pollution Prevention Plan (SWP3) — NPDES construction-stormwater (Ohio EPA Construction General Permit)
discipline
stormwater
record_date
2026-04-16
project_no
E-80410
site_address
Beery Road & Cole Street intersection, Lima / American Township, Allen County, OH 45801 (40.794819, -84.128202)
summary
NPDES construction-stormwater (SWP3) plan for the Beery Rd. & Cole St. roundabout and the co-located BOSC Storm Outfall channel — operator George J. Igel & Co., engineer WSP USA (Thomas C. Campbell, P.E.), prepared 2026-04-16, construction 2026-05-15 → 2027-12-31. Total disturbed 5.71 ac (roundabout 5.6 + outfall 1.56, overlapping). The site drains via tile to Pike Run → Ottawa; the BOSC Storm Outfall channel discharges to Pike Run. This is a roadwork-program (AEDG/PAAC roundabout) plan that also builds the data-center campus's storm outfall.
note
Ohio EPA eDocument 4091286. Stormwater Pollution Prevention Plan (SWP3) for the Beery Road & Cole Street Roundabout / BOSC Storm Outfall, American Township (Lima), Allen County, OH (40.794819, -84.128202). Prepared for George J. Igel & Company, Inc. (operator/contractor; Christopher A. Batdorff) by WSP USA Inc. (Thomas C. Campbell, P.E., Indianapolis), project E-80410, dated 2026-04-16; estimated construction 2026-05-15 to 2027-12-31. New oval roundabout (140 ft x 160 ft, 15 ft center truck apron) on new alignment plus the BOSC Storm Outfall channel and new storm sewers; 5.71 ac disturbed total (roundabout 5.6 ac + outfall 1.56 ac, overlapping; property 5.87 ac). Receiving water Pike Run (tributary of the Ottawa River) — the BOSC Storm Outfall channel terminates at Pike Run. No on-site streams/wetlands within the LOD (a PUBGx pond nearby is not impacted); a Surface Water Impact Determination letter is in Appendix I and no Section 401 / antidegradation review is required. The Appendix A NOI + Ohio EPA CGP authorization were acquired 2026-06-16 as companion eDoc 4091289 (the approval letter): Facility Permit Number 2GC08747*AG, effective 2026-04-22 under OHC000006 (record.npdes_coverage). Two new corridor parties surface here: George J. Igel & Co. (contractor) and WSP USA (engineer — also named on the campus architectural sheets per docs/COMPUTE.md).
npdes_coverage
  • facility_permit_number 2GC08747*AG
  • general_permit OHC000006
  • status approved (NOI application approved)
  • effective_date 2026-04-22
  • expiration_date 2028-04-22
  • director John Logue
  • permittee George J. Igel & Co., Inc. (Christopher Batdorff), 3500 Alum Creek Drive, Columbus OH 43207
  • facility_name_as_issued Berry Road and Cole Street Roundabout/BOSC Storm Outfall
  • facility_location_as_issued 1363 Berry Road, Elida, Allen County
  • source data/documents/plans/4091289.pdf
  • note The approval letter spells the road "Berry" (the SWP3 itself reads "Beery Road"); the as-issued spelling is preserved here, not corrected. The letter cautions that fill into regulated waters may still require a 401 WQC / Isolated Wetlands Permit — a pointer to the separate campus 401 thread (permits/3788677, 3796349, 3949585). Sequencing note: outfall coverage attached 2026-04-22, BEFORE the SWP3's 2026-05-15 estimated start — the clean contrast to the campus mass-grading, where disturbance (2025-12-08) preceded any recorded coverage (bosc-site-permit-sequence).
prepared_by
    • name WSP USA Inc.
    • discipline Civil / stormwater — engineer (SWP3 preparer of record)
    • location Indianapolis, IN (Thomas C. Campbell, P.E.)
    • name George J. Igel & Company, Inc.
    • discipline Operator / general contractor
    • location Columbus, OH (Christopher A. Batdorff; SWP3 coordinator John Powers; 24-hr emergency Joe Sharp)
design_parameters
    • parameter total property size
    • value 5.87
    • unit acres
    • parameter total area disturbed
    • value 5.71
    • unit acres
    • parameter max area disturbed at one time
    • value 5.71
    • unit acres
    • parameter roundabout disturbance (component)
    • value 5.6
    • unit acres
    • parameter BOSC Storm Outfall disturbance (component, overlaps the roundabout)
    • value 1.56
    • unit acres
    • parameter impervious area before construction
    • value 0.95
    • unit acres
    • parameter runoff coefficient (Rv) before construction
    • value 0.66
    • parameter proposed on-site impervious area
    • value 2.05
    • unit acres
    • parameter proposed runoff coefficient (Rv)
    • value 0.64
    • parameter roundabout geometry
    • value 140 ft x 160 ft diameter, 15 ft center truck apron (oval, new alignment)
    • parameter Beery Road improvements length
    • value 0.10
    • unit miles
    • parameter Cole Street improvements length
    • value 0.24
    • unit miles
    • parameter estimated construction start
    • value 2026-05-15
    • parameter estimated construction completion
    • value 2027-12-31
    • parameter receiving water
    • value Pike Run (tributary of the Ottawa River) — site drains east-to-west via subsurface tile; the BOSC Storm Outfall channel terminates at Pike Run (Point 1)
components
    • name BOSC Storm Outfall channel
    • category stormwater
    • note New outfall ditch/channel terminating at Pike Run (Point 1); constructed in Storm Outfall Phases 1-2 (start 2026-05-15). Disturbs ~1.56 ac.
    • name Beery/Cole roundabout
    • category roadway
    • quantity 140 ft x 160 ft
    • note Oval roundabout on new alignment with 15 ft center truck apron; new storm sewers, curb & gutter. Disturbs ~5.6 ac.
    • name storm sewers / curb & gutter
    • category stormwater
    • note New storm sewers serving the roundabout and outfall.
key_features
  • Existing land use: open agricultural row crops; existing drainage east-to-west, largely subsurface tile, ultimately to Pike Run → Ottawa River.
  • No on-site streams or wetlands within the Limits of Disturbance. A PUBGx freshwater pond sits west of the roundabout / north of the BOSC Storm Outfall channel and will not be impacted.
  • Surface Water Impact Determination letter included (Appendix I); no activities require Section 401 authorization or antidegradation review by Ohio EPA.
  • Soils (NRCS): TkA Thackery loam, AkA Alvada loam (hydric), WeA Westland-Rensselaer (hydric), SrA Sloan silty clay loam (frequently flooded), SfB Shawtown loam, HrB Houcktown loam (hydric), GaB Gallman loam — HSG mostly B/D.
  • BMP sequence: Storm Outfall Phase 1-2 (start 2026-05-15, end 2026-12-31) then Roundabout phases — MOT devices, inlet protection, silt fence, ditch check dams, construction entrances, dewatering filter bags / sediment basin.
  • Appendices A-I: A = NOI + Ohio EPA Authorization Email/Approval Letter; B = Site Maps & Drawings; C = Grading & Stabilization Activities Log; D = Site Inspection Forms; E = Corrective Action Log; F = Subcontractor Certifications; G = Delegation of Authority; H = SWP3 Training Log; I = Surface Water Impact Determination letter.
⚠ Gaps in the record
  • RESOLVED 2026-06-16: the Appendix A coverage record (referenced but not printed in the SWP3 body) was acquired as companion eDoc 4091289 — the Ohio EPA NPDES CGP Approval Letter assigning Facility Permit Number 2GC08747*AG (effective 2026-04-22, under OHC000006). Captured in record.npdes_coverage below. NOTE the per-site coverage number format is 2GC..*AG, NOT an OHC- number (OHC000006 is the general permit).
  • Source PDF metadata title is "SWP3-Beery Rd. Cole St. Roundabout-Draft.docx" (carries "Draft"), but the cover sheet reads as a complete, dated SWP3 (04/16/2026); treated as the working/issued SWP3 of that date.
  • Manual review of the text layer (dpi=0 sentinel); acreages/figures are printed in the document body (Construction Site Summary table), high-confidence.
Where it connects