Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Inspections & compliance reviews

Lima WWTP

edoc-678896
[verified]
Fields
agency
Ohio EPA, Division of Surface Water
district
Northwest District Office
program
NPDES
inspection_type
reconnaissance inspection
type_code
RI
facility
Lima WWTP
facility_address
1200 Fort Amanda Rd., Lima, Ohio
permit_no
2PE00000
npdes_id
OH0026069
county
Allen
inspection_date
2017-07-25
report_date
2017-08-16
entry_time
10:00 AM
exit_time
12:00
significant_noncompliance
no
units_in_service
summary
Ohio EPA conducted a reconnaissance inspection of the Lima WWTP on July 25, 2017, following a lightning strike and power outage on July 22, 2017. The strike damaged the main switchgear, causing loss of pumping capacity, overflow of final clarifiers and aeration tanks, and flooding of the plant with substantial damage. At the time of the inspection, power had been partially restored and temporary generators were in use, with final effluent to the Ottawa River appearing clear and odor-free. Compliance data for the period 3/1/2017–7/1/2017 showed zero effluent limit violations but 10 code events and 68 reported SSO events.
note
inspectors
  • Peggy B. Christie
  • Thomas Poffenbarger, P.E.
facility_representatives
  • Mr. Michael Caprella, Utilities Director
  • Mr. Dave Schnipke
  • Mr. Eric Markley, Supervisor
  • David Schnipke, Environmental Compliance Manager
observations
    • kind finding
    • text A lightning strike damaged the main switch gear, which prevented the generators from providing power to the plant when city utility power was lost.
    • number 1
    • deadline
    • kind finding
    • text Wastewater and storm water could not be pumped due to the power loss.
    • number 2
    • deadline
    • kind finding
    • text The final clarifiers and aeration tanks overflowed, flooding the plant and causing substantial damage.
    • number 3
    • deadline
    • kind finding
    • text SCADA was inoperable due to power loss to the Administrative Building.
    • number 4
    • deadline
    • kind finding
    • text At the time of the inspection, power had been restored to most of the plant. Temporary generators and pumps were being utilized for all other major treatment units. The Administrative Building did not yet have power.
    • number 5
    • deadline
    • kind finding
    • text Final effluent discharged to the Ottawa River was clear, colorless and had no noticeable odor.
    • number 6
    • deadline
⚠ Gaps in the record
  • TWIN CAPTURE — not the canonical reading. The portal serves this 2017-07-25 reconnaissance inspection at two docids; edoc-1851474 is the same letter and is canonical for FIDELITY (a scan is read by the vision path alone, with nothing to check itself against). Declared in data/site/document-versions.yaml as a `v2` cluster — the two files are NOT byte-identical.
  • Document read from page images; text layer appears present and legible throughout all four pages.
  • The NPDES permit ID on the letter Re: block reads '2PE00000' (permit_no) and the form shows NPDES # '2PE00000' with Ohio permit OH0026069; both are recorded accordingly.
  • Permit expiration date (2/28/2015) predates the inspection date (7/25/2017), which may indicate a permit renewal was pending — noted but not recorded as a finding per instructions.
  • Exit time on form reads '12:00' with no AM/PM indicator; recorded exactly as printed.
oepa/lima/edoc-678896.inspection.yaml · p.1 · oepa