Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Enforcement

correspondence

edoc-3296408
[verified]
Fields
agency
Ohio EPA (OEPA-Northwest District)
instrument
correspondence
case_no
respondent
City of Lima, Ohio
facility
City of Lima Sanitary Lift Stations (Hickory Knoll & Cable Road); City of Lima WWTP / McDonald CSO Structure 004
permit_no
2PE00000*MD
issued_date
2015-02-27
effective_date
supersedes
Time extension granted by OEPA on January 29, 2015 (revised completion date of April 1, 2015)
penalty_usd
stipulated_penalties
status
closed
summary
This file contains two letters from the City of Lima, Ohio to OEPA-Northwest District. The February 27, 2015 letter (signed by Environmental Compliance Manager David L. Schnipke) is a completion notification under NPDES Permit 2PE00000*MD, Part I, C.b, confirming that upgrades to the Hickory Knoll and Cable Road sanitary lift stations — for which OEPA had granted an extension on January 29, 2015 — are now fully complete ahead of the revised April 1, 2015 deadline. The February 24, 2015 letter (signed by WWTP Supervisor Russell C. Bales) is a correction/notification letter reporting a dry weather by-pass at McDonald CSO Structure 004 on January 4, 2015, where a gate operator failure caused approximately 12.23 MG of sewage to discharge to the Ottawa River, with repairs and temporary preventive measures underway.
note
obligations
    • requirement Complete critical upgrades to two sanitary lift stations (Hickory Knoll and Cable Road) — part of NPDES 2PE00000*MD, Part I, C.b (Schedules)
    • deadline 2015-04-01
    • status completed — Hickory Knoll returned to full service 2015-01-22; Cable Road returned to full service 2015-02-19
    • requirement Report dry weather by-pass / CSO overflow at McDonald CSO Structure 004 (gate operator failure causing ~12.23 MG discharge to Ottawa River on January 4, 2015); make repairs to gate operator and implement temporary overflow-prevention measures
    • deadline
    • status repairs underway; temporary measures in place as of February 24, 2015
⚠ Gaps in the record
  • The permit number in the OCR reads '2PE00000*MD' — the asterisk may be an OCR artifact for a digit or character; verified against image which appears consistent.
  • Two separate letters are embedded on this page; both are captured under a single record.
  • The February 24, 2015 letter references 'URS Project No. 14578549' only in the February 27 letter; the CSO letter is a separate notification.
  • Volume figure '12.23MG' is from OCR; image appears to confirm this reading.
Where it connects
oepa/lima/edoc-3296408.order.yaml · p.1 · oepa