Watermark.
Lima BOSC
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Building
The record
Record · Compliance reports

Lima Consent Decree (CD), Doc #5 Filed 01/13/15

edoc-1104344.progress-report
[verified]
Fields
agency
U.S. EPA Region 5 / Ohio EPA (Division of Surface Water)
instrument
Lima Consent Decree (CD), Doc #5 Filed 01/13/15
case_no
3:14-CV-02551-JZ
paragraph
33
respondent
City of Lima, Ohio
facility
City of Lima Wastewater Treatment Plant, Lima, Ohio
permit_no
2PE00000*ND
report_date
2019-07-31
period_start
2019-01-01
period_end
2019-06-30
deadlines_status
Lima was required to sample and analyze effluent from its nitrification towers from July 2018 to July 2019 and had until May 31, 2019 to determine if the sampling period was sufficient to determine compliance. Lima determined the sampling period was not sufficient, submitted a letter requesting an extension on May 30, 2019, and received approval from USEPA and OEPA on June 20, 2019.
noncompliance_reasons
Lima determined that the nitrification tower sampling period (July 2018–July 2019) was not sufficient to demonstrate compliance with performance criteria. Lima requested and received an approved extension from USEPA and OEPA on June 20, 2019.
summary
This is the semiannual compliance progress report filed by the City of Lima, Ohio under Paragraph 33 of the Lima Consent Decree (Case 3:14-CV-02551-JZ) for the period January 1, 2019 through June 30, 2019, received by Ohio EPA on July 31, 2019. Lima reports that it received approved extensions for nitrification tower sampling compliance determination, continued construction on multiple infrastructure projects including the Headworks Project and Simmon's Field CSO EQ Basin, and reported 251 SSO and 55 CSO overflow events as well as three NPDES permit exceedances at Station 001. The CMOM program report documents 5.65 miles of sewer cleaning and 6.99 miles of CCTV inspection during the period.
note
Total overflow counts for reporting period: 251 SSO events, 55 CSO events (26 total report locations). Overflow Totals Report updated 7/1/2019. CMOM program report also included per Paragraph 19: 29,847 linear feet (5.65 miles, 5.7% of SSS) cleaned; 36,904 linear feet (6.99 miles, 7% of SSS) CCTV inspected; 430 manholes inspected. No material problems noted for the period (Clause c: None). No cross-connections detected or eliminated (Clause e: None). Signed by Michael H. Caprella, Director of Utilities, City of Lima, Ohio.
projects
    • name Lima Wastewater Treatment Headworks Project
    • status Building and tank construction is complete.
    • next_period Continued seeding of the nitrification towers and performance testing of TSS and BOD.
    • name CMOM Plan
    • status Lima submitted a plan revision to USEPA on 7/31/18. On 3/1/19 Lima received approval from USEPA/OEPA with a stipulation to implement the plan within 30 days. Lima implemented the plan immediately.
    • next_period
    • name Asset Management — Phase 1 High Street/Jameson Avenue Sewer Rehabilitation Project
    • status Construction continues. Installation of the 10-inch sanitary sewer is complete. On 2/6/19, Lima entered into an engineering contract with Black & Veatch Inc. to design and bid the Phase 2 Woodward & Grand Avenue Sewer Rehabilitation Project. A project kickoff meeting was conducted on 2/27/19. Flow metering, sewer cleaning and geotechnical investigation is currently underway.
    • next_period HDPE lining of 550 feet of 78-inch and 2,190 feet of 54-inch segmented block sewers (Phase 1). For Phase 2: Completion of final drawings and specifications; prepare and issue bid documents; award bid and move into the construction phase.
    • name Supplemental Environmental Project (SEP)
    • status Project is complete. Maintenance of the project area will continue. A controlled burn of the river bank grasses to control invasive grass species was conducted the week of 4/8/19.
    • next_period Maintenance of the project area will continue.
    • name Simmon's Field CSO EQ Basin
    • status Completion of the diversion structure and the 96-inch diversion pipe; completion of the 54-inch force main across the Ottawa River; approximately 75% of base complete; approximately 75% of wall structures complete; approximately 40% of roof structure complete; approximately 66% of pump station wet well structure complete.
    • next_period Completion of base slab; continued construction of walls and interior support structures; continued construction of pump station wet well.
agency_contacts
  • January 31, 2019 — Lima submitted to OEPA a strategic plan for the control of Dissolved Hexavalent Chromium, as required by NPDES 2PE00000*ND, Part I, C — Schedule of Compliance, B, 2.
  • February 1, 2019 — Lima submitted a Local Limit evaluation and technical justification document, as required by NPDES 2PE00000*ND, Part I, C — Schedule of Compliance, C, 1.
  • March 1, 2019 — Lima received a letter from USEPA approving the CMOM Program Plan, as last submitted by the City on 7/31/18. Implementation was initiated immediately.
  • March 1, 2019 — Lima received a letter from USEPA approving the CSO Operations Plan, as last submitted by the City on 7/31/18. Implementation was initiated immediately.
  • May 30, 2019 — Lima submitted a request to USEPA/OEPA for a one-year extension of the sampling period to determine compliance of the nitrification towers with the performance criteria as defined in Appendix C of the Consent Decree.
  • June 20, 2019 — Lima received a letter from USEPA approving the request for an extension of the sampling period to determine compliance of the nitrification towers with the performance criteria as defined in Appendix C of the Consent Decree.
permit_exceedances
  • March 19, 2019 — Lima reported an exceedance of the Daily Maximum pH limit at Station 001. This exceedance was later determined to be a recording error related to the calibration of the pH probe.
  • May 25, 2019 — Lima reported an exceedance of the residual chlorine limit at Station 001. This occurrence was related to the SCADA programming work being done for wet-weather treatment.
  • June 28, 2019 — Lima reported an exceedance of the geometric mean for e-Coli for the month of June at Station 001. A line supplying sodium hypochlorite to the contact chambers was discovered to be plugged. A new line was installed.
discharge_events
    • kind Water-in-Basement (WIB)
    • location Various locations, City of Lima
    • date April–June 2019
    • frequency 18 recorded occurrences during the reporting period
    • duration
    • volume
    • estimated no
    • note 14 events directly attributed to rainfall that surcharged the system; 4 events due to blockages (roots, grease, etc.) in City mainlines. 1 WIB project completed this period (total 145 since inception). 3 more projects in progress.
    • kind SSO
    • location MH#14 on Lost Creek Golf Course (Annual Report #302, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 18
    • duration
    • volume
    • estimated
    • note YTD overflow count for reporting period
    • outfall_id 2PE00000047
    • kind CSO
    • location S. Central Ave. & Ottawa River (Annual Report #007, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 14
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000007
    • kind CSO
    • location Timberlake Sewer & Ottawa River (Annual Report #008, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 8
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000008
    • kind CSO
    • location Oxford Ave. & Collett Street (Annual Report #009, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 1
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000009
    • kind CSO
    • location North Shore Dr. & Cole St. (Annual Report #037, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 7
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000037
    • kind CSO
    • location Lakewood Ave & Charles St. (Annual Report #035, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000035
    • kind CSO
    • location Judkins Ave at Kunneke Ave (Annual Report #034, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000034
    • kind CSO
    • location Nixon Ave. at Kunneke Ave. (Annual Report #033, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000033
    • kind SSO
    • location Glenwood Ave. between Lakewood and Wales Ave. (Annual Report #303, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 8
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000029
    • kind SSO
    • location S. Pears Ave. at Kunneke Ave. (Annual Report #304, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 1
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000028
    • kind SSO
    • location Lakewood Ave. & Maplewood Drive (Annual Report #305, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 1
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000027
    • kind SSO
    • location S. Pears Ave. between Wendell Ave & Lakewood Ave. (Annual Report #306, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 5
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000026
    • kind SSO
    • location 418 South Pears (MH 0-10) (Annual Report #307)
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location S. Pears Ave. between Lowell Ave. & Wendell Ave. (Annual Report #308, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 14
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000025
    • kind SSO
    • location S. Pears Ave. between W. Spring & W. Elm St (Annual Report #309, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 12
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000023
    • kind SSO
    • location Between W. Spring & W. Elm, East of Primrose Pl (Annual Report #310, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 13
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000024
    • kind SSO
    • location 1861 Wendell (Annual Report #311)
    • date January 1 – June 30, 2019
    • frequency 1
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location S. Cable Rd. at Lakewood Ave. (Annual Report #313, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 17
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000031
    • kind SSO
    • location S. Cable Rd. at Wendell Ave. (Annual Report #314, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 16
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000032
    • kind SSO
    • location Dale Dr. & Idlewild Dr. (Annual Report #316, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 6
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000022
    • kind SSO
    • location Dale Dr. between W. Wayne & Oakland Pkwy (Annual Report #317, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 14
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000020
    • kind SSO
    • location Dale Dr. & West Wayne St. (Annual Report #318, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 11
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000021
    • kind SSO
    • location University Ave. & Dale Dr. (Annual Report #319, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 10
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000018
    • kind SSO
    • location Columbia @ Allentown, MH#92 (Annual Report #320)
    • date January 1 – June 30, 2019
    • frequency 15
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location 1379 N. Cable Road Lift Station (Check Valve) (Annual Report #321, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000051
    • kind SSO
    • location 1700 Allentown Road Lift Station (Check Valve) (Annual Report #322, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 5
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000050
    • kind SSO
    • location Rosedale @ Ellison Ave. (Annual Report #323)
    • date January 1 – June 30, 2019
    • frequency 6
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location Woodlawn @ Ellison Ave. (Annual Report #324)
    • date January 1 – June 30, 2019
    • frequency 9
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location Woodlawn Ave. & Feeman Ave. (Annual Report #325, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 12
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000017
    • kind CSO
    • location Metcalf St. & Tremont Ave. (Annual Report #014, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 0
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000014
    • kind CSO
    • location Metcalf St. & Ashton Ave. (Annual Report #016, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000016
    • kind CSO
    • location Metcalf St. & Runyan Ave. (Annual Report #015, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000015
    • kind CSO
    • location West & O'Connor Ave (Annual Report #038, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 4
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000038
    • kind CSO
    • location McDonel St. & O'Connor Ave. (Annual Report #012, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000012
    • kind CSO
    • location Burch Ave. & O'Connor Ave. (Annual Report #011, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000011
    • kind CSO
    • location Metcalf St. & O'Connor Ave. (Annual Report #013, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000013
    • kind SSO
    • location Northwold St. & O'Connor Ave. (Annual Report #326, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000010
    • kind SSO
    • location 1330 Melrose Ave. (Annual Report #327, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 0
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000049
    • kind SSO
    • location Metcalf St. & Lane Ave. (Annual Report #329, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 0
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000042
    • kind SSO
    • location Metcalf St. & Ford Ave. (Annual Report #330, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000044
    • kind SSO
    • location Burch & Ford (Annual Report #331)
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note No EPA ID listed
    • kind SSO
    • location 2032 Burch Ave. (Annual Report #332, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000046
    • kind SSO
    • location Burch Ave. & Lewis Ave. (Annual Report #333, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 2
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000045
    • kind SSO
    • location Metcalf St. & Lewis Blvd. (Annual Report #334, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000043
    • kind SSO
    • location Celia Place & Northern Ave. (Annual Report #335, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 1
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000041
    • kind SSO
    • location Karen St. & Lewis Blvd. (N) (Annual Report #336, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 17
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000039
    • kind SSO
    • location Karen St. & Lane Ave (Annual Report #337, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 16
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000038
    • kind SSO
    • location West St. Lift Station (Annual Report #338, EPA ID )
    • date January 1 – June 30, 2019
    • frequency 3
    • duration
    • volume
    • estimated
    • note
    • outfall_id 2PE00000056
⚠ Gaps in the record
  • Permit number partially illegible in OCR ('2PE00000*ND'); read from document context as a placeholder mask.
  • Several overflow locations list no EPA ID (marked '**************' in the original).
  • Overflow event frequency counts are YTD totals for Jan 1–Jun 30, 2019; no individual event dates, durations, or volumes are provided in the attached Overflow Totals Report.
  • Report page count noted as '1 of 64' suggesting many attachment pages not included in the scanned excerpt provided.