Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.
The public's share of the project arrives as roads — four roundabouts and two
corridor rebuilds the developer books as a private contribution. The price is set by six Tetra Tech
Opinion of Probable Project Cost estimates extracted from the PAAC
production. Each total is the high-confidence construction subtotal
carried up by a contingency + inflation rate (the source applies 25%).
Turn the rate, pick intersections, and watch the modeled program cost re-derive —
over the committed estimate, which it reads but never edits. Full record:
the cost estimates (OPC) →;
the narrative: follow the money →.