- The comment window on the Bistrozzi "Bosc" indirect-discharge permit closed, and no final permit has issued
- The campus's own discharge characterisation measures a different data center, 90 miles away
- The campus discloses a 0.10 MGD sanitary design flow — cut by two thirds from the permit it replaces
- The project's cost-benefit analysis is withheld
- The site plan sets are withheld twice over
- Pursue outstanding PRR records: item 4 cost-benefit + items 5-15 county wastewater universe
- Track the disposition of the Level-2 wetland permit DSW401252260W (incomplete 2025-12-23)
- Acquire the corridor environmental records (forcemain + Shawnee II Ph2 NPDES/SWPPP/ESC; item-9 MGD) — the #151 referral