Watermark.
All sites
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →

Facility compute

Rack count and power draw, estimated from permits and equipment manifests.

Data sources Facility permitsVendor datasheets

Square footage first

Compute capacity is estimated from permitted floor area and cooling-system tonnage before any equipment manifest is available — always labeled as inference, and reported as a range from three independent methods.

Manifests correct the estimate

Where an air permit or equipment manifest lists specific generator or chiller models, the record replaces the floor-area estimate with the manifest figure.

Backup power is a tell

The number and size of backup generators, read from air permits, is one of the few figures that scales cleanly with facility size.

A backup-generator count read from the air permit is [verified] ; the IT-load bracket estimated from permitted floor area is [inference] .

Guardrail

A rack-count estimate is never presented with the precision of a manifest figure.