Stormwater & the built surface
The runoff a campus-scale impervious surface adds to the design storm.
Gap
- the site grading and drainage plan — requested, not produced.
The record behind this chapter
What this chapter stands on: the records it reads, the inputs its modeled figures rest
on, and the reference data behind its baselines — the same pages the record screens
serve, not a second copy. A figure the record does not support stays [open] and links nothing.
Record groups this chapter reads
- Permits6 records