Three different fill volumes, two incompatible framings, and no instrument behind any of them
The City's Safety-Service Director announced ~660,000 gal as a ONE-TIME fill (2026-04-21); a County Commissioner described 700,000 gal that "will last 6 to 8 years"; the since-deleted project microsite carried 5,500 gal. The same ~660,000 gal is framed BOTH as a one-time fill and as an annual draw depending on who is speaking, and that ambiguity is the whole lead — at 660,000 gal/yr the draw is 0.0018 MGD, below the 0.01 MGD floor and consistent with a dry loop; as a one-time fill it says nothing about ongoing use at all. ⚠️ EVERY ONE OF THESE FIGURES IS THE CITY'S OR A CITIZEN'S, NOT QTS'S. The operator's own live FAQ declines to state a volume ("can vary widely … hard to predict"), so no number here is an operator disclosure and none of them can corroborate the closed-loop claim. Per the B2 reconciliation (#1682) the disclosed figure lands on `disclosed_makeup`, which by rule never feeds the classifier and never upgrades the source: a self-report of the very claim under test is not an instrument. The outcome stays a `gap` with the [reference] cooling pin KEPT.