Van Wert
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
The record
Record · Local legislation

City of Van Wert Ordinance 26-05-029 — amending Code of Ordinances §150.03 to define "Data Center" and modify "Public Service Facility", and §150.15(h)(1) to add data centers as a permitted use in the I-2 General Industrial district, passed as an emergency on first and final reading 2026-05-11

2026-05-11-ord-26-05-029-data-center-code-amendment
[verified]
Fields
instrument
City of Van Wert Ordinance 26-05-029 — amending Code of Ordinances §150.03 to define "Data Center" and modify "Public Service Facility", and §150.15(h)(1) to add data centers as a permitted use in the I-2 General Industrial district, passed as an emergency on first and final reading 2026-05-11
ordinance_no
26-05-029
body
Council of the City of Van Wert, Ohio
body_kind
city_council
committee
Judiciary and Annexation
subject_matter
zoning_text_amendment
adopted
2026-05-11
outcome
approved
emergency
yes
readings
first and final (statutory rules suspended)
title_verbatim
AN ORDINANCE TO AMEND VAN WERT CODE OF ORDINANCES SECTION 150.03 TO ADD THE TERM "DATA CENTER" AS A DEFINED TERM AND TO MODIFY THE DEFINITION OF THE TERM "PUBLIC SERVICE FACILITY", TO AMEND VAN WERT CODE OF ORDINANCES SECTION 150.15(h)(1) BY ADDING DATA CENTERS AS A PERMITTED USE IN THE I-2 GENERAL INDUSTRIAL ZONING CLASSIFICATION, AND DECLARING AN EMERGENCY.
effect
Writes "Data Center" into the Van Wert Code of Ordinances for the first time, adds it to the I-2 General Industrial permitted-use list, and rewrites the "Public Service Facility" definition.
new_definition_verbatim
"Data Center. A facility comprised of a building or group of buildings designed to incorporate a large number of computer servers used for the storage of, processing, and distribution of large amounts of data, and the accessory equipment and structures necessary to support the critical functions of the facility such as (but not limited to) generators, cooling towers, fuel storage, and electrical equipment."
definition_note
[verified] The City's own definition names GENERATORS, COOLING TOWERS and FUEL STORAGE as accessory equipment a data center is expected to carry — written into the code in the same sitting that approved a campus the record elsewhere describes as closed-loop and non-evaporative. The definition is generic and permits an evaporative build; it is not a constraint on this campus and does not contradict the closed-loop disclosures. Recorded because the code text, not the press release, is what binds the next applicant.
public_service_facility_change
[verified] The amended §150.03 definition adds a footnote to "power plants or substations": "*These facilities can only be operated in the I-2 zoning district." Generation and substation siting citywide was narrowed to I-2 in the same ordinance that made data centers an I-2 use.
permitted_use_list_as_amended
  • General manufacturing
  • Manufacturing, sale and storage of building materials
  • Transport and trucking terminals
  • Wholesale business
  • Warehousing
  • Food processing
  • Public service facility
  • Grain elevators and feed mills
  • Sexually oriented businesses, subject to § 150.51
  • Homeless shelter
  • Emergency shelter
  • Drop in center
  • Permanent supportive housing
  • Transitional housing
  • Data Center
vote
  • roll_call_recorded no
  • as_recorded_verbatim "Moore seconded; all concurred. Ordinance passed."
  • note [verified] NO NUMERIC TALLY — a second and "all concurred", not a roll call and not a count.
source_pages
  • body 26-05-029-draft-ordinance.pdf pp. 0-1
  • exhibit_a 26-05-029.pdf pp. 2-3
  • passage 5.11.26.pdf p. 4
what_this_instrument_does_not_establish
  • IT IMPOSES NO CONDITION ON A DATA CENTER. The amendment defines the use and permits it in I-2; it sets no water, discharge, noise, height, lighting or generator condition of any kind. Whatever conditions bind this campus are in Ordinance 26-05-030's Exhibit C, which contains only a landscape mound.
  • IT NAMES NO OPERATOR. The definition and the use-list entry are generic code text. Nothing in this ordinance joins the term to QTS, to any tenant, or to the annexed acreage.
⚠ Gaps in the record
  • The source PDF is an UNSIGNED pre-passage upload with an unfilled passage clause, posted four days before the vote. Passage rests on the approved minutes.
  • Read entirely by OCR of page images at 300 DPI; there is no text layer to check against.
Where it connects
van-wert/council/2026-05-11-ord-26-05-029-data-center-code-amendment.resolution.yaml · p.1 · van-wert