Watermark.
Urbana
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

Governance & the local record

The ordinances, resolutions, votes, and minutes that approved — or refused — the project.

On the record
Legislative instrumentsgrounded
1
resolutions, ordinances, zoning applications as docketed, and filed court instruments on this site's record
[verified]
  • An instrument on the record says what was moved, not what was decided — some are pending or proposed, and the deliberation that produced any of them lives in minutes and audio that are separate records.

The record behind this chapter

What this chapter stands on: the records it reads, the inputs its modeled figures rest on, and the reference data behind its baselines — the same pages the record screens serve, not a second copy. A figure the record does not support stays [open] and links nothing.

Record groups this chapter reads