Watermark.
Urbana
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
The impact study

The impact study Urbana never received

The environmental and economic study that should precede any abatement or rezoning — assembled from the public record. Where the record is silent, the silence is the finding.

Confirmed Urbana Technology Hub · Thor Equities Group (developer of record)

5 of 15 chapters on the record · 5 partial · 5 gaps named

Evidence tags

[verified]
Read from a cited record or a live source — confirmed and reproducible.
[inference]
A labelled reading or derivation from cited inputs — reasoning, not a record.
[reference]
An outside published specification or dataset — authoritative, but not a record about this site.
[open]
Withheld, unresolved, or not yet checked — a question, not a verdict.

Every figure in this study wears one of these tags. A chapter's verdict — On the record · Partial · Gap · Watch — measures the record, never the project's press.

Part I

The project

What this study is, how it reads evidence, and the project on the record.

  1. 01 Scope & method What a real impact study is, who normally commissions one, and how this one reads evidence. On the record
  2. 02 The project on the record Operator, lifecycle, load, cooling, and footprint — every undisclosed field a named blank. the IT load on the record is a screening bracket, not an instrument-grounded figure Partial
  3. 03 Land assembly & the deal How the land was put together, by whom, and what the paper trail says about when. On the record
Part II

The environment

Water, heat, groundwater, runoff, and air — each screened where the record allows.

  1. 04 Water supply & consumptive use How much water the project consumes, against the receiving water's own cited low flows. a metered, contracted or permit-grounded water quantity — the cooling method is disclosed here, but no quantity is. Gap
  2. 05 The discharge & the receiving water Dilution at the design low flows, and the burden the receiving water already carries. baseline context only — the project-side record has not been produced Partial
  3. 06 Heat The discharge's heat against the reach's temperature criterion at design low flow. a thermal characterization for this project — none exists on the record. Gap
  4. 07 Groundwater & dewatering The wells within reach of the site's pumping, and where the pumped water went. a well survey and any dewatering record — neither has been produced. Gap
  5. 08 Stormwater & the built surface The runoff a campus-scale impervious surface adds to the design storm. the site grading and drainage plan — requested, not produced. Gap
  6. 09 Air The dispersion footprint of the campus's permitted generator fleet. an air-permit application for this project — none is on the record. Gap
Part III

The economy

The labor baseline, the grid and its ratepayers, the fiscal trade, and the balance.

  1. 10 Labor & the local baseline What this economy is before the project — the denominator every jobs claim divides by. On the record
  2. 11 Power & ratepayers Whose grid this load lands on, and what it does to the households on the same wires. the campus load is a screening bracket — the demand-pressure read is withheld until an instrument grounds it Partial
  3. 12 The fiscal trade What tax revenue is being traded away, for how long, and what the paper trail says. the incentive instruments are on the record, but the accounting is not — no auditor's abatement report and no exemption ledger says what the trade cost Partial
  4. 13 Governance & the local record The ordinances, resolutions, votes, and minutes that approved — or refused — the project. On the record
  5. 14 The public balance What the community gives against what it is documented to get — a verdict over the chapters. synthesizes the screened chapters — 1 on the record, 2 partial, 5 gap Partial
Part IV

What's missing

Every gap this study names, as one inventory — each with the record that would close it.

  1. 15 The gap inventory Every gap this study names, with the record that would close it and where to send it. On the record