Watermark.
Sidney
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

The gap inventory

Every gap this study names, with the record that would close it and where to send it.

On the record

This page collects every ask the study makes: 4 gaps named across 4 chapters. Each ask names a public record that an office could produce tomorrow. Each is the same ask the site's leads board already tracks, never a second copy of it. An absence on this page is a finding, not a locked door.

What this study cannot compute yet

A real impact study would report a single consumptive-draw figure against the receiving water's low-flow floor. [open]

Computing it requires any record of how the facility rejects heat — a water contract, a wastewater permit, or a cooling-plant spec; until one surfaces, the water figures stay a bracketed range across candidate archetypes.

A real impact study would report how much heat the discharge adds to a reach screened against Ohio's numeric temperature criterion at its design low flows. [open]

Computing it requires a thermal characterization for this project — none exists on the record.

A real impact study would report the dispersion footprint of the campus's permitted backup-generator fleet. [open]

Computing it requires a DRAFT permit or public notice — an air-permit application is on the record here, but the document that names the generator fleet has not issued.

A real impact study would report the campus's share of the serving utility's, balancing authority's, and state's annual load, from a grounded load figure. [open]

Computing it requires an instrument that grounds the IT load — an air permit or an interconnection filing; the load on the record is a screening bracket.

The site's open questions beyond these chapters

  • [open] Resolution 69-25 — pulled, and it is not what the recitals said it was data/extracted/sidney/council/2025-09-08-res-69-25-cra-expansion-and-megaproject-tier.resolution.yaml · data/extracted/sidney/council/2022-10-10-res-84-22-citywide-cra-established.resolution.yaml
  • [open] The approved site plan — an administrative approval, so there is no agenda item to watch data/extracted/sidney/regulatory-watch.yaml (city site-plan review) · data/extracted/sidney/data-centers.md "Instruments to pull" §2
  • [open] The City's significant-industrial-user permit — the only instrument that meters this campus data/extracted/sidney/data-centers.md "Separating the campus's wastewater" · data/extracted/sidney/incentive-instruments.yaml (Res. 26-26 §1.1.4, Schedule 1)
  • [open] The Ohio EPA air permit-to-install for emergency generators — a verified negative, re-check data/extracted/sidney/regulatory-watch.yaml (instruments, air PTI) · data/extracted/sidney/data-centers.md "Regulatory record"
  • [open] Three deeds, not one — the recorder still owes grantors, instrument numbers and consideration data/extracted/sidney/data-centers.md "The deeds - three, not one" · data/reference/sidney/parcel-assemblage.geojson (Shelby County Auditor CAMA, read 2026-07-31)
  • [open] The Ohio Tax Credit Authority's Sixth Amendment — half the abatement term rests on it data/extracted/sidney/incentive-instruments.yaml (CRA Agreement megaproject, §12) · data/extracted/sidney/data-centers.md "Megaproject status"
  • [open] The annexation or rezoning ordinance — the City's own GIS cannot close the zoning question data/extracted/sidney/data-centers.md "Zoning district" · SidneyGIS_AllLayers/MapServer/270 (read 2026-07-31)
  • [open] The grading plan and storm water report recited on the face of the grading permit data/documents/sidney/permits/Grading Permit 5-14-2026 - AWS Data Center 2388 W. Millcreek Road.pdf · data/extracted/sidney/data-centers.md "Construction"
  • [open] Exhibit D is blacked out edge to edge, with ORC 149.433 written beside it by hand in blue ink data/documents/sidney/council/27-26 - Authorizing Infrastructure Development Agreement - Amazon Web Services.pdf (Article 1 definitions, Exhibit D) · data/extracted/sidney/data-centers.md "Records posture"
  • [open] Both major agreements give the company five business days to try to stop a records release data/extracted/sidney/incentive-instruments.yaml (public_records_clause, §32) · data/extracted/sidney/data-centers.md "Records posture"
  • [open] The PILOT schedule runs 14 years in one instrument and 15 in another — neither was reconciled data/extracted/sidney/incentive-instruments.yaml (schedule_term_discrepancy) · data/extracted/sidney/data-centers.md "Schedule discrepancy"
  • [open] Resolution 27-26 and the agreement it authorizes name two different Amazon entities data/extracted/sidney/data-centers.md "The resolution and the agreement name different Amazon entities" · data/extracted/sidney/incentive-instruments.yaml (parties)
  • [open] Ohio SOS foreign registration for both Amazon entities — a blocked route, not an absence data/extracted/sidney/data-centers.md "Ohio EPA entity registrations" · data/extracted/sidney/regulatory-watch.yaml (route_hazards)
  • [open] Five state permits have issued across this project and not one of them states a load data/extracted/sidney/data-centers.md "Power draw (MW)" · data/extracted/sidney/regulatory-watch.yaml (instruments)
  • [open] PUCO 25-958-EL-AIR — the AES Ohio stipulation and its data-center tariff sheets data/extracted/sidney/regulatory-watch.yaml (PUCO 25-958-EL-AIR) · aes-ohio.com press release 2026-07-21
  • [open] A FERC eLibrary transmission service agreement between AES Ohio and Amazon for this campus data/extracted/sidney/data-centers.md "Instruments to pull" §10 · sidneyoh.com/526 (Proposed Data Center FAQ)
  • [open] The City contracted away its power to create a data-center water rate class for ten years data/extracted/sidney/incentive-instruments.yaml (rate_class_covenant, impact_fees) · data/extracted/sidney/data-centers.md "The City contracted away its data-center rate class"
  • [open] Is the Sidney well field inside a designated sole-source aquifer, and is the campus upgradient? data/extracted/sidney/groundwater.md (#1997) · data/extracted/sidney/data-centers.md "Dominant hydrologic soil group" · data/concepts/ssa.md
  • [open] The body that reviews this abatement every year publishes nothing, anywhere data/documents/sidney/cra-housing-council/CRA Housing Council Minutes March 05, 2026.pdf · data/reference/subdivisions/sidney/subdivisions.yaml (the CRA Housing Council row, which records the split)
  • [open] The three vote meetings are on the record — and one of the six votes was not unanimous data/documents/sidney/council/filename-map.yaml (the three minutes files, and the second-route block that records the API and the enumeration) · data/extracted/sidney/regulatory-watch.yaml (route_retests) · data/extracted/sidney/council/*.resolution.yaml (the vote blocks)

The full board, with lifecycle and filters, is at open leads and open questions.

Sections of the site still awaiting a source

Distinct from the study's gaps: these are whole sections of the record that have not opened yet — the needs board's asks, not the study's.