Watermark.
Sidney
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
The record
Record · Permits

City of Sidney WWTP

1PD00009
[verified]
Fields
tag
[verified]
permit_no
1PD00009*SD
application_no
OH0027421
permit_action
renewal
permittee
City of Sidney
applicant_of_record
Mayor and Council, City of Sidney, 201 W Poplar Street, Sidney, OH 45365
facility_name
City of Sidney WWTP
facility_address
1091 Children's Home Road, Sidney, OH 45365, Shelby County
action_date
2022-12-16
effective_date
2023-01-01
expiration_date
2027-12-31
signed_by
Laurie A. Stevenson, Director
total_pages
47
public_notice_no
163939
public_notice_date
2022-11-07
receiving_water
Great Miami River at River Mile 128.68
stream_network
Great Miami River → Ohio River (Great Miami basin, Shelby County, OH; HUC-8 05080001). The plant discharge enters the mainstem UPSTREAM of the Loramie Creek confluence at Lockington and DOWNSTREAM of the USGS Great Miami River at Sidney gage 03261500.
renewal_due
The permit's own text requires the renewal submission "no later than 180 days prior to" expiration — i.e. by approximately 2027-07-04 for the 2027-12-31 expiration. As of 2026-07-31 no renewal application, draft permit or public notice exists on the record.
Where it connects
oepa/sidney/1PD00009.npdes.yaml · · oepa