Watermark.
Sidney
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
The record
Record · Local legislation

City of Sidney Ordinance No. A-3236 — adopting amendments to the Zoning Code, including §1111.05(u) guard shacks and floodplain updates, passed 2025-09-22

2025-09-22-ord-a-3236-guard-shacks
[verified]
Fields
instrument
City of Sidney Ordinance No. A-3236 — adopting amendments to the Zoning Code, including §1111.05(u) guard shacks and floodplain updates, passed 2025-09-22
ordinance_no
A-3236
body
Council of the City of Sidney, Ohio
body_kind
city_council
subject_matter
zoning_text_amendment
adopted
2025-09-22
outcome
approved
guard_shacks
  • tag verified
  • section §1111.05(u)
  • iim_only_verbatim Guard shacks are permitted in the IIM Zone only.
  • limits
    • Permitted in any yard, on the same zoning lot as the principal building
    • Minimum 15 feet from every property line and 10 feet from the principal building
    • Maximum 199 square feet total gross floor area
    • Maximum 18 feet in height from grade
  • note [verified] The IIM zone is the campus's zone (Ord. A-3226). This is the second use the City confined to IIM alone, after the data-center use itself.
⚠️_defect_in_the_enacted_text
  • tag verified
  • read text layer AND 300-dpi render of p.7
  • section §1117.02 definition
  • verbatim Guard Shack. A structure located on private property for the purpose of manually or electronically monitoring pedestrian and / or vehicular traffic and promoting security by substantially impeding or restricting ingress or egress to said property. A guard shack shall not be
  • finding THE DEFINITION STOPS MID-SENTENCE. "A guard shack shall not be " is followed immediately by the next glossary entry, "Historic structure:". The render shows the red-underlined NEW text simply ending — there is no strikethrough, no continuation and no missing page. The City adopted an unfinished sentence.
  • why_it_is_not_an_artifact Confirmed from the page image, not only the text layer, and struck-through text elsewhere in the same exhibit does still render — so an extraction failure does not explain it.
data_centers
  • tag verified
  • mentions 0
  • note A clean negative over the whole ordinance. Together with A-3255 (2026-02-23, also zero), this establishes that Sidney has not revisited the data-center use since creating it in A-3219.
⚠️_timing_is_not_causation
  • tag verified
  • fact This ordinance's public hearing was held 2025-09-08 — the same meeting that passed Res. 69-25's thirty-year megaproject tier — and it returned for deliberation on 2025-09-22.
  • guard RECORD THE COINCIDENCE, WRITE NO CAUSAL CLAIM. Neither instrument names the other; neither names any data center; the Council minutes of 2025-09-08 present the amendments as ODNR/FEMA floodplain updates and clarifications.
vote
  • roll_call_recorded no
  • outcome_recorded no
  • note [open] Enacting clause, passage date and Attest line only. The 2025-09-22 minutes are unpulled.
what_this_instrument_does_not_establish
  • ANY LINK TO THE CAMPUS. It names no project, no company and no parcel.
  • WHAT A GUARD SHACK MAY NOT BE. The sentence that would have said so is truncated in the adopted text.