The project on the record
Operator, lifecycle, load, cooling, and footprint — every undisclosed field a named blank.
Most campuses in this network were assembled quietly through Delaware shells, and the first job is figuring out who is behind them. Findlay is the opposite case. The customer described the facility in a press release on 2024-11-11; the host described the same facility in a registration statement filed with the SEC ten weeks later, on 2025-01-23. The numbers agree. That makes this the network’s cleanest disclosed load — and it changes the skill required: when the developer tells you the number, the question stops being who and becomes what exactly did they commit to, in what document, and what happened to that document afterward.
The facility, from both sides
One Power Co — privately held, CEO Jereme Kent — owns a campus in Allen Township, Hancock
County, at I-75 and Township Road 215. Its Form S-1 calls it MWHub 01, the “Findlay Megawatt
Hub”: current capacity 30 MW, planned maximum 150 MW, status Operating, first energized in
2023. The anchor customer is named in the same document — MARA Holdings, Inc., a bitcoin miner,
on a 150 MW, 15-year, take-or-pay lease, payment “due regardless of whether or not the customer
elects to purchase power.” [verified]
The customer had already said it, independently and ten weeks earlier: MARA’s release describes “a
150-megawatt operation in Findlay, Ohio, which already has 30 megawatts of capacity.” [verified]
That is two-sided corroboration. A single company’s description of its own project is a claim;
the same figure from the counterparty, in a separate document issued for a different purpose and
audience, is a fact. And the two are not the same kind of record — MARA’s is investor relations,
One Power’s a registration statement signed under securities-law liability. That is why the 150 MW
here is [verified] while every acreage-derived load in this network is [inference].
Whether the full 150 MW is energized today is [open]. “Intended by end-2025” is a plan, and no
reviewed source confirms the build-out completed.
MARA Holdings ≠ Marathon Petroleum. MARA Holdings, Inc. (NASDAQ: MARA), formerly Marathon Digital Holdings, is the bitcoin miner holding the 150 MW contract. Marathon Petroleum Corp (NYSE: MPC) is a refiner headquartered in Findlay and a Hancock County NPDES and air permittee. They are unrelated. Both attach to the string “Marathon … Findlay, Ohio,” and a graph that merged them would attribute a refinery’s permits to a data center in the same county.
The filing that stopped, and the land that doesn’t reconcile
The S-1 was withdrawn (Form RW) on 2025-05-09; the IPO never went effective. A Form D private
placement followed in July 2025, then a September reorganization, layoffs and a lender workout, and
on 2026-02-16 OnSite Partners acquired One Power Company. [verified] Read as a sequence: a
developer that tried the public markets, withdrew, restructured under lender pressure, and was
bought by an infrastructure fund — while holding a fifteen-year take-or-pay that pays whether or not
the tenant draws power. The contract is the asset. That is a [reference]-grade reading of a
corporate chain, not a finding about anyone’s solvency.
A withdrawn filing is still evidence, of a specific kind: an S-1 that never went effective was still signed, and still carries liability for what it states about existing operations. Its account of a running facility is strong. Its account of what the company plans is a marketing document no regulator ever tested.
The holding of record is eight Allen Township parcels, 108.65 acres, standing in three One
Energy vehicles. The S-1 calls the campus “~170 acres.” The 61-acre gap is not closed here, and no
parcel was invented to close it. [open] Nor is the deed chain missing for lack of looking:
Hancock County publishes no parcel ArcGIS service, the Auditor’s live CAMA returns Cloudflare HTTP
403 to every non-browser request, and the Recorder’s index 404s outside a browser session — all
probed 2026-08-02. Distinguishing unsearched from empty is the whole discipline: a negative
check is only worth [verified] when the search actually ran.
The record behind this chapter
What this chapter stands on: the records it reads, the inputs its modeled figures rest
on, and the reference data behind its baselines — the same pages the record screens
serve, not a second copy. A figure the record does not support stays [open] and links nothing.
- Permits2 records
- Local legislation3 records
- Entity LEIs (GLEIF)Reference dataset