Watermark.
Troy · Piqua
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live

How the record was assembled — and withheld

2 events, cause → consequence — each traceable to the extraction that supplied it, the evidence node colored by its citation. Every beat carries its standing: verified events are sourced; open events mark where the record is still being fought for. The order is the argument: the confidentiality went on before the public ever heard the name.

2022
2022-06-21 npdes public notice [verified]
NPDES 1PD00008*WD (Piqua Wastewater Treatment Plant (WWTP)) — public notice
action renewal; receiving Great Miami River
2022-07-28 npdes comment deadline [verified]
NPDES 1PD00008*WD (Piqua Wastewater Treatment Plant (WWTP)) — comment period ends