Watermark.
Bowling Green · Middleton Twp
Switch site 38 sites · 11 basins 8 open

Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.

MAU Maumee Basin 9 sites
2MI The Two Miamis 9 sites
SE Southeastern Basins 12 sites
NE Northeast Basins 8 sites
The page — what opens on Watermark Open · Draftfull record Queued · Watchingpreview page Restrictedrequest access
The campus — the build on the ground Investigating Confirmed Under construction Operational
All 38 sites — the network index →
Live
The record
Record · Permits

Apollo Power Generation Facility

P0139272
[verified]
Fields
agency
Ohio EPA
program
Air Permit-to-Install (Division of Air Pollution Control), Northwest District Office
permit_no
P0139272
facility_id
0387022027
action
application preliminarily and administratively complete
action_date
2025-12-08
application_received_date
2025-12-05
effective_date
expiration_date
applicant
Will-Power OH LLC - Apollo
applicant_address
2000 Commerce Dr., Pittsburgh, Pennsylvania 15275
contact_name
Andy Woerner
signed_by
Clinton Reed, Ohio EPA DAPC (419.373.3137, clinton.reed@epa.ohio.gov)
project_name
Apollo Power Generation Facility
site_address
Wood County, Ohio
affected_resource
air
parcel_ids
note
Dates the front of the air chain. The application was filed 2025-12-05 — one month after the OPSB siting application of 2025-11-05, and two months before the siting certificate took effect by automatic approval on 2026-02-03. So the air review began while the siting case was still open and outlasted it by four months.
copied
  • Andrea Moore DAPC
  • Jennifer Delbecq DAPC
  • Aniyah Woodley DAPC
⚠ Gaps in the record
  • COMPLETENESS IS NOT APPROVAL, AND THE LETTER SAYS SO: "This determination does not imply that the application is approvable, only that all the necessary material has been submitted to continue the review."