power-siting-board-ohio-020326.pdf
Open the in-browser reader
Rendering power-siting-board-ohio-020326.pdf…
What has been read from it
This document has been through the extract stage. The structured record read from it:
- The Apollo Power Generation Facility siting case — 350 MW net behind-the-meter gas generation plus ~119.5 MW / 239 MWh of battery storage, certified by automatic approval on the accelerated letter-of-notification track with no public hearings, and expressly barred from interconnecting to the grid Utility siting — cases & filings
data/extracted/grid/bowling-green/apollo-power-generation-facility.yaml
Where this came from
Source of record: data/documents/grid/bowling-green/power-siting-board-ohio-020326.pdf — immutable chain-of-custody
evidence, served verbatim. The address of this page is derived from that path and does not
change when the page does.