442E22100Asphalt concrete surface course, 12.5mm, Type A (449) (CY)
442E22400Asphalt concrete intermediate course, 19mm, Type A (449) (CY)
609E12001Combination curb and gutter, Type 2, as per plan (FT)
609E31000Combination curb and gutter, Type 9 (FT)
609E26000Curb, Type 6 (FT)
decorative_pavementDecorative reinforced concrete pavement, 6" thick (truck apron), as per plan (SY)
614E11000Maintaining traffic (LS)
623E10000Construction layout stakes and surveying (LS)
624E10000Mobilization (LS)
sub_estimates
nameCole Street / Diller Road Roundabout
pdf_page319
workRoundabout at Cole/Diller intersection
construction_subtotal1228174
contingency_inflation_25pct~307043
total1535218
section_subtotals
roadway109307
erosion_control85000
drainage120440
pavement302631
water_work50000
lighting100000
traffic_control75000
landscaping20000
right_of_way8161
incidentals120000
design_survey_inspection272633
nameCole Street / Bluelick Road Roundabout
pdf_page321
workRoundabout at Cole/Bluelick intersection
construction_subtotal1363602
contingency_inflation_25pct340900
total1704502
section_subtotals
roadway113984
erosion_control80000
drainage146440
pavement252402
water_work100000
lighting100000
traffic_control75000
landscaping20000
right_of_way12314
incidentals120000
design_survey_inspection373341
namePrimary Access Entrance to Project Site (Roundabout)
noteMain BOSC facility entrance; at Beery Road & North Cole Street (per agreement narrative). Largest roundabout.
pdf_page323
construction_subtotal2122436
contingency_inflation_25pct530609
total2663045
section_subtotals
roadway241889
erosion_control100000
drainage208200
pavement681232
water_work50000
lighting150000
traffic_control75000
landscaping20000
right_of_way275
incidentals140000
design_survey_inspection455078
nameCole Street / West Street (SR 115) Roundabout
noteODOT District One reviewing whether this roundabout is needed.
pdf_page325
construction_subtotal1799687
contingency_inflation_25pct449922
total2249609
section_subtotals
roadway170516
erosion_control75000
drainage156010
pavement514322
water_work50000
lighting100000
traffic_control75000
landscaping20000
right_of_way13627
incidentals130000
design_survey_inspection437212
nameCole Street Corridor
typecorridor (widening/rehab, not an intersection)
pdf_page327
construction_subtotal3119840
contingency_inflation_25pct779960
total3899800
section_subtotals
roadway392686
erosion_control65000
drainage284040
pavement1777183
water_work65000
incidentals90000
design_survey_inspection441848
notesCorridor sheets omit RIGHT_OF_WAY, LIGHTING, TRAFFIC_CONTROL, LANDSCAPING line sections present on roundabout sheets.
nameBluelick Road Corridor
typecorridor (widening/rehab, not an intersection)
pdf_page328
construction_subtotal1744725
contingency_inflation_25pct436181
total2180907
section_subtotals
roadway223596
erosion_control35000
drainage153400
pavement898471
water_work35000
incidentals60000
design_survey_inspection348858
reconciliation
diller_ocr_correctionOCR earlier rendered Diller total as $4,535,217.80; the correct figure is $1,535,217.80 (leading digit is a 1, not a 4). Construction total of $14,223,081 only reconciles with the $1.535M figure.
agreement_vs_opc_bluelickRoadwork agreement narrative states $2.5M 'specifically budgeted' for the Bluelick & N. Cole roundabout. The OPC lists that roundabout at $1,704,502. The $2.5M likely bundles the Bluelick roundabout + Bluelick corridor work + contingency/ROW, or reflects a budgeting allowance distinct from the engineer's estimate. Flag for the County Engineer.
state_route_labelAgreement and design-build minutes variously reference SR 115 and SR 65 for the Cole Street west roundabout. OPC labels it 'Cole Street / West Street (SR 115).' Confirm correct route designation.
quantities_caveatLine-item quantities transcribed from a degraded scan are approximate. Dollar totals/subtotals are high-confidence.
pp. 317–328 · Public Records Request 01 · summary sheet · sheet 1 of 11
The summary sheet is shown as a committed crop of the source scan (regenerated by scripts/render_walk_crops.py); the full 11-sheet exhibit is available on request.
② What we read from it
Program total
$14,223,081
Sub-estimates
6 corridors
Contingency
25%
Largest — Cole St
$3,899,800
Drainage line
$1,068,530 · 7.5%
Design-storm basis
~ not cited
Detention shown
~ none
● figures read live from the published record · ~ markers preserved as approximate
③ What it reveals
The public's road package is priced to the dollar — $14,223,081 — yet drainage is just 7.5% of it, the only one of six items detailed, with no design-storm basis and no detention shown. A number that precise on a scope that thin is the tell.
pp. 317–328 · Public Records Request 01 · summary sheet · sheet 1 of 11
The summary sheet is shown as a committed crop of the source scan (regenerated by scripts/render_walk_crops.py); the full 11-sheet exhibit is available on request.
② What we read from it
Program total
$14,223,081
Sub-estimates
6 corridors
Contingency
25%
Largest — Cole St
$3,899,800
Drainage line
$1,068,530 · 7.5%
Design-storm basis
~ not cited
Detention shown
~ none
③ What it reveals
The public's road package is priced to the dollar — $14,223,081 — yet drainage is just 7.5% of it, the only one of six items detailed, with no design-storm basis and no detention shown. A number that precise on a scope that thin is the tell.
pp. 317–328 · Public Records Request 01 · summary sheet · sheet 1 of 11
The summary sheet is shown as a committed crop of the source scan (regenerated by scripts/render_walk_crops.py); the full 11-sheet exhibit is available on request.
② What we read
1
Program total, priced to the dollar
$14,223,081
2
Drainage — only 1 of 6 items itemized
$1,068,530 · 7.5%
3
No design-storm basis · no detention
scope gap
③ What it reveals
The public's road package is priced to the dollar — $14,223,081 — yet drainage is just 7.5% of it, the only one of six items detailed, with no design-storm basis and no detention shown. A number that precise on a scope that thin is the tell.
Same five beats, three shapes: split for a clean
two-column source, scroll for the vertical reflow
, and annotated for the redaction-heavy artifact.
The flow is a choice on the screen — the record data never changes.