Each site is a section of the Watermark platform — pivoted by basinstate. Live & building sites open; queued and tracking
sites route to their coming-soon / watch page.
LiveBuildingQueuedTracking Locked
Switch site 35 sites · 10 basins2 states35 openGroup by
Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.
The whole assessment hinges on four withheld or non-binding inputs:
the building share of the $500M, the real job count, whether the campus takes the
sales-tax exemption, and the School District Compensation the county won't disclose.
None is invented here; each is turned across its industry-reference band
(industry reference, not this campus). The simulator prices the opacity —
and shows, record by record, exactly how much disclosure would narrow it.
Net 15-year public give:
$71.8M – $89.2M
for ~50 jobs — about 0.1% of the county's
49,577 covered jobs.
Full essay: the economic ledger →